Air conditioning and ventilation for an angiography room

HVAC system design to fit out a single-plane angiography room to the requirements of an invasive procedure area: positive pressure, HEPA filtration and unidirectional airflow.

Service
HVAC design and specifications
Rooms
3, totaling 57.4 m²
Air changes
30 per hour
Final filtration
HEPA H14

The challenge

The institution was renovating an existing area of its diagnostic imaging department to install a new angiography system, along with its equipment room and a control room.

Under Colombian healthcare infrastructure regulations, the angiography room is treated as an area equivalent to an operating room. The system had to ensure asepsis, temperature control, air quality and positive pressure, while also removing the heat from the angiography system and its auxiliary equipment in continuous operation.

Design criteria

  • Outdoor conditions: ASHRAE 2021 climate data for Bogotá, at 2,548 m above sea level, with 20.9 °C dry bulb.
  • Indoor conditions: 22 °C ± 2 °C and relative humidity of 50 % ± 10 %.
  • Local regulations: Ministry of Health Resolution 1633 of 2025 and Resolution 3100 of 2019, the Technical Regulation for Thermal Installations (RETSIT) and NTC 5183 on indoor air quality.
  • International standards: ASHRAE 62.1, 90.1, 55 and 52.2, and SMACNA standards for duct construction and for testing and balancing.

The system

Each room has its own unit, for operational continuity and individual control of conditions.

  • Angiography room: a 3,000 cfm air handling unit delivering 100 % of the required airflow. It ensures 30 air changes per hour and 12 outdoor air changes, with positive pressure relative to adjacent areas.
  • Three-stage filtration: MERV 8 and MERV 13 prefilters, and a final HEPA H14 filter.
  • Distribution: polyisocyanurate (PIR) panel ducts for airtightness and cleanliness, with linear slot diffusers to achieve unidirectional flow over the procedure table.
  • Pressure control: an exhaust box with a HEPA filter and variable frequency drive, regulating airflow with pressure sensors at the doors and corridor.
  • Control and equipment rooms: 600 cfm and 400 cfm fan coils connected to the same 16 kW VRF condensing unit.
Room airflow path MERV 8MERV 13HEPAcoiland fan OutdoorairAir handling unitRoomExhaust 30 air changes per hourpositive pressurewith HEPA filter3,000 cfm, 12 outdoor air changes per hour
Simplified diagram prepared by FJR. It does not include the return air or every accessory.

Plan layout

linear slot diffusers angiography table low exhaust in the corners Angiography roomEquipment roomControl room 42.9 m²4.1 m²10.4 m²400 cfm fan coil600 cfm fan coilfour-way diffusers positive pressure
Diagram prepared by FJR from the project drawings. Not to scale and without the actual architectural layout.

Deliverables

  • Technical specifications for equipment and materials.
  • HVAC drawings for the renovation.
  • Heat load calculation reports.
  • Construction budget for the system.
  • Criteria for commissioning, testing, balancing and as-built documentation.